
Engineered Recycling Systems (ERS) is finalizing the commissioning of a new corrugated scrap conveyance system built for high-volume trim removal and dust control in a packaging production environment. This installation features ERS’s proven technologies—including the Balancing Fan, LPS Separator, and CCM® Filter—configured for continuous scrap handling, clean discharge, and OSHA/NFPA compliance.
Trim removal from corrugated converting lines
Airflow balancing for reduced energy demand
Filtration system with rotating nozzle cleaning
Dust cyclone and pucker discharge into baler
This installation is part of a growing number of ERS systems commissioned across the industry.
https://boardconvertingnews.com/ers-corrugated-scrap-conveyance-system-nears-commissioning/
Comments are closed.